Steps to developing a winning CTIP grant application

15 Feb 2013Archived News Climate Change Matters

With limited time to conclude Clean Technology Investment Program (CTIP) funding arrangements, it is more important than ever to have expert assistance to develop the proposition and supporting data to maximise the chances of success, with the minimum number of clarification iterations from AusIndustry. 

The process we recommend for the development of a successful grant application is outlined below:

  1. Identify, screen and select energy savings opportunities.
  2. Supplier engagement and tendering. Evaluating technology options, assessing suppliers and obtaining quotes in order to meet internal capital expenditure requirements.
  3. Project evaluation and business case development. Your application needs to show technical and financial evaluation of savings, a true capital cost with energy and greenhouse saving forecasts, capital cost estimates based on formal quotes from equipment and technology vendors and a thorough capital budgeting financial (NPV) cash flow analysis. 
    Energetics can financial analysis/modelling, integrating outcomes into your capital budgeting and/or evaluation approval process.  We can provide an independent expert report and quantify greenhouse gas emissions savings.
  4. Grant writing. Grant applications need to meet the basic requirements of the AusIndustry SmartForm, and contain calculations and detailed evidence to convince an expert evaluation panel that project technical risks are minimal and manageable.
  5. Project delivery to meet requirements on award of grant funds.
  6. Measurement and verification.  You need to meet the grant obligations and deliver accurate data on capital and operating costs, energy, carbon and financial savings associated with project measures. Independent M&V is essential for large grant applications. Energetics has a high proportion of all trained practitioners in the International Monitoring and Verification protocol.
  7. Energy procurement optimisation. Major energy savings can be achieved through your energy supply contracts, particularly through Contract Maximum Demand (CMD) charges. Once the CTIP project is complete you will have a detailed understanding of energy consumption, load profile and trends which will assist in securing the most competitive energy supply contracts possible.

Talk through the opportunities to win a CTIP grant and top-up financing that can cover a substantial part of a project’s cost, by contacting one of our CTIP team. 
 

Join the conversation

Get in touch with our expertsView All

Andrew Lister

Principal Consultant

View Profile